| Determine which impacts to fisheries resources and fishing activity need to be monitored: |
| The energy resource is | | Wind | Go to A | Tidal | Go to B | Waves | Go to C | (A) The wind turbine foundation is | | Monopile OR tripod OR lattice OR gravity | Go to A1 | Floating mooring | Go to A3 | (A1) The stage of the monopile, tripod, lattice, or gravity wind turbine project is | | Construction | X1, X2, X5 | Operation | X1, X2, X3, X5 | Decommissioning | X1, X2 | (A2) The stage of the floating mooring wind project is | | Construction | X1, X2, X5 | Operation | X3, X4, X5 | Decommissioning | X1, X2 | (B) The tidal turbine type is | | Open OR shrouded bottom mounted | Go to B1 | Open OR shrouded floating mooring | Go to B2 | (B1) The stage of the bottommounted tidal turbine project is | | Construction | X1, X2, X5 | Operation | X1, X2, X3, X4, X5 | Decommissioning | X1, X2 | (B2) The stage of the floating mooring tidal turbine project is | | Construction | X1, X2, X5 | Operation | X1, X2 X3, X4, X5 | Decommissioning | X1, X2 | (C) The wave device type is | | Point absorber OR wave attenuator OR oscillating water column OR overtopping | Go to C1 | Oscillating wave surge converter | Go to C2 | (C1) The stage of the point absorber OR wave attenuator OR oscillating water column OR overtopping project is | | Construction | X1, X2, X5 | Operation | X1, X2, X5 | Decommissioning | X1, X2 | (C2) The oscillating wave surge converter project scale is | | Construction | X1, X2, X5 | Operation | X1, X2, X3, X5 | Decommissioning | X1, X2 |
|
|