Research Article

A Synchronized Multipoint Vision-Based System for Displacement Measurement of Civil Infrastructures

Figure 14

Result of the time synchronization test: (a) time lag between the subsystems and (b) displacement with an excitation frequency of 1 Hz.
519146.fig.0014a
(a)
519146.fig.0014b
(b)