Research Article

CO2 Mitigation Measures of Power Sector and Its Integrated Optimization in China

Table 2

Main parameters in IOCM [17ā€“20].

Life (years)Investment cost (CNY/kW) (CNY/KWh) (hours) (gram/kWh)
20152020

Coal2537240.35211769746
Gas2532220.322938384.5373
Hydro4045000.12342400
Nuclear50110740.08786100
Wind3095000.08204700
Solar25150000.0893200
Biomass25100000.4435600
LVE24330250000
MVE1014390400000
TVE30151520400000
FCVE1050000250000
AVE1030000200000
SGVE13000876000