Research Article

The Use of the Direct Optimized Probabilistic Calculation Method in Design of Bolt Reinforcement for Underground and Mining Workings

Figure 1

Approximation of the restricted probability distributions: (a) original approximation, (b) discrete approximation, (c) pure discrete approximation, and (d) piecewise uniform approximation.
267593.fig.001a
(a)
267593.fig.001b
(b)
267593.fig.001c
(c)
267593.fig.001d
(d)