Study on the Application of the Kent Index Method on the Risk Assessment of Disastrous Accidents in Subway Engineering
Table 5
Risks or accidents identified in Section
3.
| No. | Risk/accident |
| 1 | Face instability | 2 | Cutter head and tool wear | 3 | Large size bearing breaking | 4 | Failure of bearing seal | 5 | Failure of hoisting jack | 6 | Mud cake | 7 | Clogging at the exit of slurry | 8 | Failure of tail skin brush | 9 | Failure of pushing axis control | 10 | leakage water at the segment | 11 | Failure of segment erection | 12 | Segment uplift | 13 | Jammed grouting pipe | 14 | Bad grouting effect |
|
|