Table 1

Geographic position, peak level ( ), and distance from the piling location of the underwater noise measurements at the Blighbank site (monopiles A02 and B10) and at the Thorntonbank site (jackets CG3 and CB6).

Position start recording
(WGS84)
Peak level (dB) Distance (m) from piling location
LatitudeLongitude

Monopile A02
51°40.39′2°50.03′177~3000
51°39.41′2°50.64′177~4820
51°38.25′2°51.25′166~6990
Monopile B10
51°34.59′2°57.31′159~14150
51°38.52′2°48.16′185~1580
51°38.50′2°47.44′193~770
Jacket CG3
51°33.92′2°58.94′192~250
51°51.34′2°58.36′187~500
51°33.96′2°58.93′196~250
Jacket CB6
51°33.07′2°53.94′182~600
51°32.96′2°52.59′175~1700
51°32.65′2°53.42′172~750
51°32.22′2°53.01′171~1600