Research Article

Optimization and Planning of Emergency Evacuation Routes Considering Traffic Control

Table 3

Traffic capacity and time schedule of each road section.

ArcTraffic capacity
(hundreds of vehicles)
Travel time or delay (min)ArcTraffic capacity
(hundreds of vehicles)
Travel time or delay (min)

(0, 1)202(0, 1, 9)160
(0, 2)202.5(0, 2, 11)122
(0, 6)203(0, 6, 7)160
(1, 9)162(1, 9, 10)123
(2, 11)182(1, 9, 13)83
(6, 7)122.5(2, 11, 10)120
(7, 2)103(6, 7, 2)80
(9, 10)123(7, 2, 11)102
(9, 13)163(9, 10, 12)103
(10, 9)123(10, 9, 13)83
(10, 12)161(10, 12, 13)120
(11, 10)121.5(11, 10, 9)103
(12, 13)104(11, 10, 12)83