Table of Contents Author Guidelines Submit a Manuscript
The Scientific World Journal
Volume 2014, Article ID 235970, 14 pages
http://dx.doi.org/10.1155/2014/235970
Research Article

Real-Time Safety Risk Assessment Based on a Real-Time Location System for Hydropower Construction Sites

1State Key Laboratory of Hydroscience and Engineering, Tsinghua University, Haidian, Beijing 100084, China
2China Yangtze Three Gorges Group Corporation, Beijing 100038, China

Received 13 April 2014; Revised 18 June 2014; Accepted 24 June 2014; Published 9 July 2014

Academic Editor: Xiao-Wei Ye

Copyright © 2014 Hanchen Jiang et al. This is an open access article distributed under the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.

Linked References

  1. R. Y. Sunindijo and P. X. W. Zou, “Conceptualizing safety management in construction projects,” Journal of Construction Engineering and Management, vol. 139, no. 9, pp. 1144–1153, 2013. View at Publisher · View at Google Scholar · View at Scopus
  2. G. E. Aguilar and K. N. Hewage, “IT based system for construction safety management and monitoring: C-RTICS2,” Automation in Construction, vol. 35, pp. 217–228, 2013. View at Publisher · View at Google Scholar · View at Scopus
  3. P. Lin, Q. Li, Q. Fan, and X. Gao, “Real-time monitoring system for workers behavior analysis on a large-dam construction site,” International Journal of Distributed Sensor Networks, vol. 2013, Article ID 509423, 10 pages, 2013. View at Publisher · View at Google Scholar
  4. G. M. Waehrer, X. S. Dong, T. Miller, E. Haile, and Y. Men, “Costs of occupational injuries in construction in the United States,” Accident Analysis & Prevention, vol. 39, no. 6, pp. 1258–1266, 2007. View at Publisher · View at Google Scholar · View at Scopus
  5. U.S. Bureau of Labor Statistics, Fatal occupational injuries by industry and event or exposure, All United States, 2014, http://www.bls.gov/iif/oshwc/cfoi/cftb0270.pdf.
  6. M. Zhang and D. Fang, “Cognitive causes of construction worker's unsafe behaviors and management measures,” China Civil Engineering Journal, vol. 45, no. 2, pp. 297–305, 2012. View at Google Scholar · View at Scopus
  7. P. Lin, Q. B. Li, Q. Fan, X. Gao, and S. Hu, “A real-time location-based services system using WiFi fingerprinting algorithm for safety risk assessment of workers in tunnels,” Mathematical Problems in Engineering, vol. 2014, Article ID 371456, 10 pages, 2014. View at Publisher · View at Google Scholar
  8. P. Lin, R. Wang, S. Kang, H. Zhang, and W. Zhou, “Key problems of foundation failure, reinforcement and stability for superhigh arch dams,” Chinese Journal of Rock Mechanics and Engineering, vol. 30, no. 10, pp. 1945–1958, 2011. View at Google Scholar · View at Scopus
  9. P. Lin, B. Huang, Q. B. Li, and R. K. Wang, “Hazards and seismic reinforcement analysis for typical large dams following the Wenchuan earthquake,” Engineering Geology, 2014. View at Publisher · View at Google Scholar
  10. M. Zhong, T. Liu, Y. Deng, C. Shi, T. Fu, and X. Hu, “Safety evaluation: important safeguard of work safety for enterprises in China,” Journal of Loss Prevention in the Process Industries, vol. 19, no. 6, pp. 762–768, 2006. View at Publisher · View at Google Scholar · View at Scopus
  11. C. Park and H. Kim, “A framework for construction safety management and visualization system,” Automation in Construction, vol. 33, pp. 95–103, 2013. View at Publisher · View at Google Scholar · View at Scopus
  12. I. W. H. Fung, V. W. Y. Tam, T. Y. Lo, and L. L. H. Lu, “Developing a risk assessment model for construction safety,” International Journal of Project Management, vol. 28, no. 6, pp. 593–600, 2010. View at Publisher · View at Google Scholar · View at Scopus
  13. Y. Jung, S. Kang, Y. Kim, and C. Park, “Assessment of safety management information systems for general contractors,” Safety Science, vol. 46, no. 4, pp. 661–674, 2008. View at Publisher · View at Google Scholar · View at Scopus
  14. A. Pinto, I. L. Nunes, and R. A. Ribeiro, “Occupational risk assessment in construction industry—overview and reflection,” Safety Science, vol. 49, no. 5, pp. 616–624, 2011. View at Publisher · View at Google Scholar · View at Scopus
  15. S. Aminbakhsh, M. Gunduz, and R. Sonmez, “Safety risk assessment using analytic hierarchy process (AHP) during planning and budgeting of construction projects,” Journal of Safety Research, vol. 46, pp. 99–105, 2013. View at Publisher · View at Google Scholar · View at Scopus
  16. Y. Zhu, X. Fu, K. Li, X. Shi, and J. Liu, “Application of improved LEC method to hazard evaluation in hydroelectric project construction,” Journal of Safety Science and Technology, vol. 5, no. 4, pp. 51–54, 2009. View at Google Scholar
  17. M. M. Casanovas, J. Armengou, and G. Ramos, “Occupational risk index for assessment of risk in construction work by activity,” Journal of Construction Engineering and Management, vol. 140, no. 1, 2013. View at Publisher · View at Google Scholar
  18. R. L. Brauer, Safety and Health for Engineers, John Wiley & Sons, 2006.
  19. J. Chen and Y. Yang, “A predictive risk index for safety performance in process industries,” Journal of Loss Prevention in the Process Industries, vol. 17, no. 3, pp. 233–242, 2004. View at Publisher · View at Google Scholar · View at Scopus
  20. J. M. Matías, T. Rivas, C. Ordóñez, and J. Taboada, “Assessing the environmental impact of slate quarrying using bayesian networks and GIS,” in Proceedings of the International Conference on Computational Methods in Science and Engineering (ICCMSE '07), vol. 963, pp. 1285–1288, Las Palmas, Spain, December 2007.
  21. J. M. Matías, T. Rivas, J. E. Matías, and J. Taboada, “A machine learning methodology for the analysis of workplace accidents,” International Journal of Computer Mathematics, vol. 85, no. 3-4, pp. 559–578, 2008. View at Publisher · View at Google Scholar · View at MathSciNet · View at Scopus
  22. S.-S. Leu and C.-M. Chang, “Bayesian-network-based safety risk assessment for steel construction projects,” Accident Analysis & Prevention, vol. 54, pp. 122–133, 2013. View at Publisher · View at Google Scholar · View at Scopus
  23. S. Lee and D. W. Halpin, “Predictive tool for estimating accident risk,” Journal of Construction Engineering and Management, vol. 129, no. 4, pp. 431–436, 2003. View at Publisher · View at Google Scholar · View at Scopus
  24. I. L. Nunes, “Fuzzy multicriteria model for ergonomic workplace analysis and risk analysis,” in Proceedings of the 5th International Conference: Computer-Aided Ergonomics and Safety (CAES '05), pp. 25–28, Kosice, Slovakia, May 2005.
  25. A. Azadeh, I. M. Fam, M. Khoshnoud, and M. Nikafrouz, “Design and implementation of a fuzzy expert system for performance assessment of an integrated health, safety, environment (HSE) and ergonomics system: the case of a gas refinery,” Information Sciences, vol. 178, no. 22, pp. 4280–4300, 2008. View at Publisher · View at Google Scholar · View at Scopus
  26. T. Starner and A. Pentland, “Real-time american sign language recognition from video using hidden markov models,” in Motion-Based Recognition, vol. 9 of Computational Imaging and Vision, pp. 227–243, Springer, Dordrecht, The Netherlands, 1997. View at Publisher · View at Google Scholar
  27. J. Yamato, O. Jun, and I. Kenichiro, “Recognizing human action in time-sequential images using hidden markov model,” in Proceedings of the IEEE Computer Society Conference on Computer Vision and Pattern Recognition (CVPR '92), pp. 379–385, Champaign, Ill, USA, June 1992.
  28. P. Singh, N. Kapur, and P. Kaur, “Speech recognition with hidden markov model: a review,” International Journal of Advanced Research in Computer Science and Software Engineering, vol. 2, no. 3, pp. 400–403, 2012. View at Google Scholar
  29. A. Krogh, B. Larsson, G. von Heijne, and E. L. L. Sonnhammer, “Predicting transmembrane protein topology with a hidden Markov model: application to complete genomes,” Journal of Molecular Biology, vol. 305, no. 3, pp. 567–580, 2001. View at Publisher · View at Google Scholar · View at Scopus
  30. E. L. L. Sonnhammer, G. von Heijne, and A. Krogh, “A hidden Markov model for predicting transmembrane helices in protein sequences,” Proceedings of the International Conference on Intelligent Systems for Molecular Biology (ISMB '98), vol. 6, pp. 175–182, 1998. View at Google Scholar · View at Scopus
  31. F. Gao, J. Sun, and Z. Wei, “The prediction role of hidden markov model in intrusion detection,” in Proceedings of the Canadian Conference on Electrical and Computer Engineering (IEEE CCECE '03), vol. 2, pp. 893–896, Montreal , Canada, May 2003. View at Scopus
  32. K. Haslum, A. Abraham, and S. Knapskog, “DIPS: a framework for distributed intrusion prediction and prevention using hidden Markov models and online fuzzy risk assessment,” in Proceedings of the 3rd Internationl Symposium on Information Assurance and Security (IAS '07), pp. 183–188, Sydney , Australia, August 2007. View at Publisher · View at Google Scholar · View at Scopus
  33. A. Årnes, K. Sallhammar, K. Haslum, T. Brekne, M. E. G. Moe, and S. J. Knapskog, “Real-time risk assessment with network sensors and intrusion detection systems,” in Computational Intelligence and Security, pp. 388–397, Springer, Berlin, Germany, 2005. View at Google Scholar
  34. P. Lin, Q. Li, and P. Y. Jia, “A real-time temperature data transmission approach for intelligent cooling control of mass concrete,” Mathematical Problems in Engineering, vol. 2014, Article ID 514606, 10 pages, 2014. View at Publisher · View at Google Scholar
  35. T. H. Yi, H. Li, and M. Gu, “Optimal sensor placement for structural health monitoring based on multiple optimization strategies,” The Structural Design of Tall and Special Buildings, vol. 20, no. 7, pp. 881–900, 2011. View at Publisher · View at Google Scholar · View at Scopus
  36. P. Lin, Q. Li, and H. Hu, “A flexible network structure for temperature monitoring of a super high arch dam,” International Journal of Distributed Sensor Networks, vol. 2012, Article ID 917849, 10 pages, 2012. View at Publisher · View at Google Scholar · View at Scopus
  37. P. Lin, Q. Li, S. Zhou, and Y. Hu, “Intelligent cooling control method and system for mass concrete,” Journal of Hydraulic Engineering, vol. 44, no. 8, pp. 950–957, 2013. View at Google Scholar
  38. T. H. Yi, H. N. Li, and M. Gu, “Recent research and applications of GPS-based monitoring technology for high-rise structures,” Structural Control and Health Monitoring, vol. 20, no. 5, pp. 649–670, 2013. View at Publisher · View at Google Scholar · View at Scopus
  39. A. Carbonari, A. Giretti, and B. Naticchia, “A proactive system for real-time safety management in construction sites,” Automation in Construction, vol. 20, no. 6, pp. 686–698, 2011. View at Publisher · View at Google Scholar · View at Scopus
  40. B. Naticchia, M. Vaccarini, and A. Carbonari, “A monitoring system for real-time interference control on large construction sites,” Automation in Construction, vol. 29, pp. 148–160, 2013. View at Publisher · View at Google Scholar · View at Scopus
  41. P. Najera, J. Lopez, and R. Roman, “Real-time location and inpatient care systems based on passive RFID,” Journal of Network and Computer Applications, vol. 34, no. 3, pp. 980–989, 2011. View at Publisher · View at Google Scholar · View at Scopus
  42. H.-F. Bai, T.-H. Yi, H.-N. Li, and L. Ren, “Multisensors on-site monitoring and characteristic analysis of UHV transmission tower,” International Journal of Distributed Sensor Networks, vol. 2012, Article ID 545148, 10 pages, 2012. View at Publisher · View at Google Scholar · View at Scopus
  43. L. Ran, T. H. Yi, X. W. Ye, and X. B. Dong, “Long-term deformation monitoring of metro-tunnel airshaft excavation during construction stage,” International Journal of Distributed Sensor Networks, vol. 2012, Article ID 972893, 11 pages, 2012. View at Publisher · View at Google Scholar · View at Scopus
  44. Q. Li, G. Li, and G. Wang, “Elasto-plastic bond mechanics of embedded fiber optic sensors in concrete under uniaxial tension with strain localization,” Smart Materials and Structures, vol. 12, no. 6, pp. 851–858, 2003. View at Publisher · View at Google Scholar · View at Scopus
  45. D. A. Norman, “Human-centered design considered harmful,” Interactions, vol. 12, no. 4, pp. 14–19, 2005. View at Google Scholar
  46. H. Jiang, P. Lin, M. Qiang, and Q. Fan, “A supervisor management and evaluation system based on real-time location system,” Applied Mechanics and Materials, vol. 538, pp. 198–205, 2014. View at Publisher · View at Google Scholar
  47. E. Sawacha, S. Naoum, and D. Fong, “Factors affecting safety performance on construction sites,” International Journal of Project Management, vol. 17, no. 5, pp. 309–315, 1999. View at Google Scholar · View at Scopus
  48. A. G. Vredenburgh, “Organizational safety: which management practices are most effective in reducing employee injury rates?” Journal of Safety Research, vol. 33, no. 2, pp. 259–276, 2002. View at Publisher · View at Google Scholar · View at Scopus
  49. S. R. Eddy, “Profile hidden Markov models,” Bioinformatics, vol. 14, no. 9, pp. 755–763, 1998. View at Publisher · View at Google Scholar · View at Scopus
  50. S. D. Eskesen, P. Tengborg, J. Kampmann, and T. Holst Veicherts, “Guidelines for tunnelling risk management: International Tunnelling Association, working group no. 2,” Tunnelling and Underground Space Technology, vol. 19, no. 3, pp. 217–237, 2004. View at Publisher · View at Google Scholar · View at Scopus
  51. S. Lan and Q. Zhang, “Risk assessment of deep excavation during construction based on fuzzy theory,” Chinese Journal of Geotechnical Engineering, vol. 31, no. 4, pp. 648–652, 2009. View at Google Scholar · View at Scopus
  52. P. Lin, X. Liu, Y. Hu, W. Xu, and Q. Li, “Deformation stability analysis of xiluodu arch dam under stress-seepage coupling condition,” Journal of Rock Mechanics and Engineering, vol. 32, no. 6, pp. 1137–1144, 2013. View at Google Scholar · View at Scopus
  53. P. Lin, S. Kang, Q. Li, R. Wang, and Z. Wang, “Evaluation of rock mass quality and stability analysis of Xiluodu arch dam under construction phase,” Chinese Journal of Rock Mechanics and Engineering, vol. 31, no. 10, pp. 2042–2052, 2012. View at Google Scholar · View at Scopus