Real-Time Safety Risk Assessment Based on a Real-Time Location System for Hydropower Construction Sites

Table 4

Parameters for the safety risk assessment.

ItemCost/reduction value
((N, D, V)/(C, A, M))
Distance for
very dangerous/controlled
Distance for
dangerous/affected
Distance for
normal/missed

Critical edge(0, 4, 8)<1 m1 m-2 m>2 m
Concrete vibrator(0, 5, 10)<3 m3 m–5 m>5 m
Concrete paver(0, 5, 10)<3 m3 m–5 m>5 m
Safety supervisor(0.5, 0.8, 1)<5 m5 m–10 m>10 m