Research Article

Multivariable Time Series Prediction for the Icing Process on Overhead Power Transmission Line

Table 2

The error variances of icing load prediction in same icing process for the first serious icing process from (12/17/2009~12/20/2009).

Prediction length 123456

Standard deviation (multivariable prediction based on BPNN)108.6134.5142.8181.7255.6297.5

Standard deviation (single variable prediction based on ARIMA)151.9194.7263.5289.3320.1386.2