Research Article
Displacement-Based Back-Analysis of the Model Parameters of the Nuozhadu High Earth-Rockfill Dam
Table 1
Stepwise displacement back-analyses.
| Back-analysis | Observation data date | Upstream water level | Parameters analyzed |
| 1 | Dec. 15, 2011 | 666 m | , , , (E-B) |
| 2 | May 14, 2012 | 738.3 m | , (E-B) , , (creep) , , (wetting) |
|
|