Research Article
Developing Mobile BIM/2D Barcode-Based Automated Facility Management System
Table 2
Comparison of current approach and proposed system.
| Item | Current approach | Proposed approach | Method | Average time | Method | Average time |
| Edit the defect problems of the facility | Edit the defect problems by paper-based sheet | 12–20 sec | Edit the defect problems through the BIMFM system | 6–12 sec |
| Find basic information on facility for reference | Review maintenance data on paper-based sheet | 12–23 sec | Access basic information on a facility directly by accessing and clicking BIM model | 7–13 sec |
| Refer to relevant historical maintenance information | Refer to paper-based maintenance lists and reports | 12–18 sec | Click BIM model and refer to historical maintenance information directly | 6–12 sec |
| Maintenance information updating | Identify and record results on a checklist, then re-enter at the office | 42–52 sec | Real-time data entry in the system during maintenance process | 22–42 sec |
| Mark the inspection problems at the facility location | Refer the paper-based maintenance condition and status sheet | 1–1.5 min | Illustrate overall maintenance conditions and status of FM quickly through visualized BIM model | 40–50 sec |
|
|