Research Article

Heuristics for Multiobjective Optimization of Two-Sided Assembly Line Systems

Table 3

Allocation of tasks for Ist assignment of P19 (CT = 6 min).

W/S typeAllotted tasksProcessing time for task “ Work load at each stationIdle time at each station

W/S(L)-112.802.803.20
W/S(R)-123.103.102.90
W/S(L)-2
W/S(R)-243.403.402.60
W/S(L)-38
6
3.30
2.70
6.000.00
W/S(R)-3
W/S(L)-472.602.603.40
W/S(R)-4
W/S(L)-5114.104.101.90
W/S(R)-510
13
3.70
1.80
5.500.50
W/S(L)-63
5
2.50
3.20
5.700.30
W/S(R)-6141.201.204.80
W/S(L)-795.905.900.10
W/S(R)-7175.805.800.20
W/S(L)-812
16
2.20
2.40
4.601.40
W/S(R)-8
W/S(L)-9152.302.303.70
W/S(R)-9
W/S(L)-1018
19
3.80
2.10
5.900.10
W/S(R)-10