Research Article

Heuristics for Multiobjective Optimization of Two-Sided Assembly Line Systems

Table 6

Allocation of tasks for 9th assignment of P19 (CT = 6 min).

W/S typeAllotted tasksProcessing time for task “ Work load at each stationIdle time at each station

W/S(L)-11
3
2.80
2.50
5.300.70
W/S(R)-123.103.102.90
W/S(L)-2
W/S(R)-243.403.402.60
W/S(L)-38
6
3.30
2.70
6.000.00
W/S(R)-3
W/S(L)-45
7
3.20
2.60
5.800.20
W/S(R)-4
W/S(L)-595.905.900.10
W/S(R)-510
13
3.70
1.80
5.500.50
W/S(L)-6114.104.101.90
W/S(R)-6
W/S(L)-712
16
2.20
2.40
4.601.40
W/S(R)-715
14
2.30
1.20
3.502.50
W/S(L)-8
W/S(R)-8175.805.800.20
W/S(L)-918
19
3.80
2.10
5.900.10
W/S(R)-9