Research Article
An Iterative Approach for the Optimization of Pavement Maintenance Management at the Network Level
Table 3
Characteristics of sections considered in the case study.
| Section | Type | Time since last rehabilitation (years) |
| 1 | Minimal SP with 102 mm ACO | 15 | 2 | Minimal SP with saw and seal 102 mm ACO | 20 | 3 | Intensive SP with 102 mm ACO | 20 | 4 | Crack break and seat section with 102 mm ACO | 25 | 5 | Crack break and seat section with 203 mm ACO | 25 |
|
|
Note. SP: surface preparation; ACO: asphalt concrete overlay.
|