Research Article
A Three-Stage Birandom Program for Unit Commitment with Wind Power Uncertainty
Table 8
Simulation results with different wind power forecast error curves.
| | Optimal objective value ($) | Simulated expected total costs ($) |
| Wind forecast error curve a | | | Two-stage stochastic UC | 1203659.87 | 1203638.94 | Three-stage birandom UC | 1198043.92 | 1198054.63 | Cost savings | 5615.95 | 5584.31 | Wind forecast error curve b | | | Two-stage stochastic UC | 1202987.43 | 1202996.53 | Three-stage birandom UC | 1198928.57 | 1198924.86 | Cost savings | 4058.86 | 4071.67 |
|
|