Research Article

Minimizing Thermal Stress for Data Center Servers through Thermal-Aware Relocation

Table 5

Average outlet temperatures of relocated servers before and after relocation.

Before/after relocationPeak average temperature server type A (Celsius)Peak average temperature server type B (Celsius)Overall average peak temperature (Celsius)Difference from average peak temperature (Celsius) server type ADifference from average peak temperature (Celsius) server type B

Before3942.540.7āˆ’1.76+1.74
After4140.440.7+0.23āˆ’0.35
% Change5% increase5% decreaseNo change765% improved500% improved