Displacement Back Analysis for a High Slope of the Dagangshan Hydroelectric Power Station Based on BP Neural Network and Particle Swarm Optimization

Table 2

Measured incremental displacement.

Excavation stepM42RJCM41RJM42RXM41RX

Step 80.82 mm0.87 mm
Step 91.35 mm1.37 mm2.30 mm
Step 100.15 mm0.12 mm−0.01 mm−0.10 mm