Research Article

Three-Dimensional Dynamic Analyses of Track-Embankment-Ground System Subjected to High Speed Train Loads

Figure 3

Dynamic responses along the rail top at time 1.54 s for five carriages travelling at a speed of 80 m/s.
924592.fig.003a
(a) Dynamic vertical stress
924592.fig.003b
(b) Displacement