Research Article
Three-Dimensional Dynamic Analyses of Track-Embankment-Ground System Subjected to High Speed Train Loads
Figure 3
Dynamic responses along the rail top at time 1.54 s for five carriages travelling at a speed of 80 m/s.
|
(a) Dynamic vertical stress |
|
|
|