Research Article

Three-Dimensional Dynamic Analyses of Track-Embankment-Ground System Subjected to High Speed Train Loads

Figure 4

Curves of dynamic response at the rail top for five carriages travelling at  m/s (288 km/h).
924592.fig.004a
(a) Time history of the vertical displacement
924592.fig.004b
(b) Vertical velocity
924592.fig.004c
(c) Frequency content of the vertical velocity