Long-Term Assessment of an Innovative Mangrove Rehabilitation Project: Case Study on Carey Island, Malaysia

Table 2

Estimation of hard-engineering restoration of the project at Carey Island in 2008 and 2012 with consideration of inflation rate.

No.ItemDescriptionUnitUnit cost (RM)Total quantity for 80 m lengthTotal cost 2013 (RM) with inflation rateTotal cost 2008 (RM)Total cost 2013 (USD) with inflation rateTotal cost 2008 (USD)

1L-block interlocking (60 × 75 cm), concrete: grade 45, steel bar (diameter 10)Ready mix concrete (normal mix), grade 45 m319327.52885,313.064,747.751,736.291,551.51
Steel barton2216.671.696123,759.743,359.701,228.671,097.94

2Stone (D50 = 17–20 cm)density: 2300 kg/m3ton30637.6319,128.9017,093.596,251.275,586.14

3Gabion basket (diameter 6 mm)1 m × 1 m × 1 mm unit6022513,500.0012,063.604,411.763,942.35

4Wire covered by plastic (diameter 4 mm)m62641,584.001,415.46517.65462.57

5Employer (8 person per day for 1.5 month)day10036036,000.0032,169.6011,764.7110,512.94

The total price (for 1920 m2)79,285.7070,849.7025,910.3623,153.50

The total price (for 0.01 km2)412,946.34369,008.85134,949.78120,591.13