Research Article

Risk Assessment of Fishing Trawl Activities to Subsea Pipelines of Sabah and Labuan Waters

Table 7

Subsea pipeline Erb West oil field to Labuan data.

Pipeline namePipe length (km)Pipe diameter (inch/cm)Design codeWT (mm)Yield strength (kN/m2)Pull-over load (kN)

ID80 Erb West to LGAST140.414/35.5API 5L X429.532.9 × 105 @ 42 ksi24.01
ID85 Erb West to SBGST60.416/40.6API 5L X6015.94.2 × 105 @ 60 ksi25.98
ID107 Semarang to LGAST4614/35.5API 5L X529.533.55 × 105 @ 52 ksi28.19
ID144A Semarang to LGAST47.7120/50.8API 5L X6511.14.5 × 105 @ 65 ksi38.183