Research Article
An Operation Control Strategy for the Connected Maglev Trains Based on Vehicle-Borne Battery Condition Monitoring
Table 6
The remaining capacity related strategies.
| Remaining capacity | Operation control strategies |
| Not enough to provide energy for levitation and emergency braking | Turn off air conditioners and other vehicle-borne equipment. The train is not allowed to run unless the required capacity is charged. |
| Enough to provide energy for levitation and emergency braking, but cannot provide enough energy for vehicle-borne equipment | Turn off the vehicle-borne equipment to keep safe levitation to the next ASA for recharging. |
| Meets all the vehicle energy requirements | Run normally |
|
|