Research Article

An Operation Control Strategy for the Connected Maglev Trains Based on Vehicle-Borne Battery Condition Monitoring

Table 6

The remaining capacity related strategies.

Remaining capacityOperation control strategies

Not enough to provide energy for levitation and emergency brakingTurn off air conditioners and other vehicle-borne equipment. The train is not allowed to run unless the required capacity is charged.

Enough to provide energy for levitation and emergency braking, but cannot provide enough energy for vehicle-borne equipmentTurn off the vehicle-borne equipment to keep safe levitation to the next ASA for recharging.

Meets all the vehicle energy requirementsRun normally