Research Article

SVM-Based Dynamic Reconfiguration CPS for Manufacturing System in Industry 4.0

Figure 14

Simulation results for during event occurrence: (a) event occurrence in machine #1-3 (t = 5,200); (b) event occurrence in machine #2-3 (t = 3,400).
(a)
(b)