Research Article

Channel Characteristics of Rail Traffic Tunnel Scenarios Based on Ray-Tracing Simulator

Table 1

Tunnel scenarios by leaky cables.

Scenarios Description Notation

2cThe tunnel is equipped with a leaky cable that communicates with the train’s roof RP and with the UE through the RPTwo hop
2gLaying leaky cables in the tunnel to achieve direct coverage of the UEOne hop