Research Article
Channel Characteristics of Rail Traffic Tunnel Scenarios Based on Ray-Tracing Simulator
Table 1
Tunnel scenarios by leaky cables.
| Scenarios | Description | Notation |
| 2c | The tunnel is equipped with a leaky cable that communicates with the train’s roof RP and with the UE through the RP | Two hop | 2g | Laying leaky cables in the tunnel to achieve direct coverage of the UE | One hop |
|
|