The Construction of Builder Safety Supervision System Based on CPS

Table 1

Building settlement monitoring data.

An office building-surface settlement monitoring daily report
Survey point numberInitial measurement (m)Last measurement (m)This measurement (m)Deformation (mm)Deformation rate (mm/d)

P167.1423167.1428667.14247-0.39-0.39
P267.1370167.137767.1373-0.43-0.43
P367.0416267.0423467.04153-0.81-0.81
P467.0095567.0101967.00876-1.43-1.43
P567.0061567.0096467.00538-1.56-1.56
P667.0578767.0585167.05703-1.48-1.48