Optimal Research and Numerical Simulation for Scheduling No-Wait Flow Shop in Steel Production
Table 2
Results of LB(3)/LB(2).
| Distribution | Uniform | Normal | 5 | 10 | 15 | 5 | 10 | 15 |
| Machine | | | | | | | 100 jobs | 1.0632 | 1.0369 | 1.0362 | 1.0392 | 1.0310 | 1.0493 | 200 jobs | 1.0313 | 1.0305 | 1.0271 | 1.0438 | 1.0321 | 1.0380 | 500 jobs | 1.0453 | 1.0709 | 1.0254 | 1.0363 | 1.0248 | 1.0346 | 1000 jobs | 1.0298 | 1.0456 | 1.0245 | 1.0340 | 1.0269 | 1.0259 | 1500 jobs | 1.0199 | 1.0304 | 1.0220 | 1.0273 | 1.0309 | 1.0238 |
|
|