Research Article

Multi-Controller Placement Optimization Using Naked Mole-Rat Algorithm over Software-Defined Networking Environment

Table 8

Ernet: controller placement for K = 2 and 3 using both NMR and BAT at 0.9 SC + 0.1 CC scenario.

Number of controllers (K) at 0.9 SC + 0.1 CCNumber of controlled switches
Node (8), DelhiNode (0), PuneNode (3), MumbaiNode (7), Bengaluru

2 (NMR/BAT) algorithm9 switches, nodes: 4, 5, 8–147 switches, nodes: 0–3, 6, 7, 15 switches

3 (NMR/BAT) algorithm9 switches, nodes: 4, 5, 8–143 switches, nodes: 0, 1, 34 switches, nodes: 2, 6, 7, 15