Research Article

Multi-Controller Placement Optimization Using Naked Mole-Rat Algorithm over Software-Defined Networking Environment

Table 9

Ernet: controller placement for K = 4 using both NMR and BAT at 0.9 SC + 0.1 CC scenario.

Number of controllers (K) at 0.9 SC + 0.1 CCNumber of controlled switches
Node (8), DelhiNode (3), MumbaiNode (13), KolkataNode (7), BengaluruNode (6), Chennai

4 (BAT algorithm)6 switches, nodes: 4, 5, 8, 10–123 switches, nodes: 0, 1, 33 switches, nodes: 9, 13, 144 switches, nodes: 2, 6, 7, 15

4 (NMR algorithm)6 switches, nodes: 4, 5, 8, 10–123 switches, nodes: 0, 1, 33 switches, nodes: 9, 13, 144 switches, nodes: 2, 6, 7, 15