Rational Embracing of Modern Prototyping Capable Design Technologies into the Tools Pool of Product Design Teams
Table 3
Managerial criteria and factors included in the model.
| Level 1 Branch main node | Level 2 Main managerial criteria | Level 3 Managerial criteria factors |
| 2. Managerial issues of prototyping decisions | 2.1 Cost | 2.1.1 Labor cost | | | 2.1.2 Overhead and depreciation costs | | | 2.1.3 Fabrication/operation cost | | | 2.1.4 Consumables cost | | | 2.1.5 Cost to rebuild the same | | | 2.1.6 Cost to rebuild modified | | 2.2 Time |
2.2.1 Preparation/preprocessing | | | 2.2.2 Fabrication/operation/processing | | | 2.2.3 Finishing | | | | | | 2.2.4 Time to rebuild the same | | | 2.2.5 Time to rebuild the modified | | 2.3 Method reliability and risk involved |
2.3.1 Repeatability of result | | | 2.3.2 Possibility of method failure | | | 2.3.3 Impact of method failure | | | 2.3.4 Possibility of equipment failure/malfunction | | | 2.3.5 Ease of resuming operation/repairing | | | 2.3.6 Operators expertise |
|
|