Research Article

Condition Based Maintenance Optimization of an Aircraft Assembly Process Considering Multiple Objectives

Table 3

Parameters for evaluation of performance objectives.

Simulation parametersValues

Maximum number of aircraft per year 83.429
Allowable production loss 0.05
Crane
 Fixed maintenance cost 1
 Ratio for service level maintenance cost 1
 Nominal response time 168 hrs
Flex track
 Fixed maintenance cost 2
 Ratio for service level maintenance cost 1.5
 Nominal response time 504 hrs
Rivet gun
 Fixed maintenance cost 0.4
 Ratio for service level maintenance cost 0.6
 Nominal response time 336 hrs