Research Article
Condition Based Maintenance Optimization of an Aircraft Assembly Process Considering Multiple Objectives
Table 3
Parameters for evaluation of performance objectives.
| Simulation parameters | Values |
| Maximum number of aircraft per year | 83.429 | Allowable production loss | 0.05 | Crane | | Fixed maintenance cost | 1 | Ratio for service level maintenance cost | 1 | Nominal response time | 168 hrs | Flex track | | Fixed maintenance cost | 2 | Ratio for service level maintenance cost | 1.5 | Nominal response time | 504 hrs | Rivet gun | | Fixed maintenance cost | 0.4 | Ratio for service level maintenance cost | 0.6 | Nominal response time | 336 hrs |
|
|