Research Article
RELAP5 Analyses of ROSA/LSTF Experiments on AM Measures during PWR Vessel Bottom Small-Break LOCAs with Gas Inflow
Table 3
Chronology of major events in LSTF tests.
| Event | Time (s) | SP3 | SP4 | SP6 |
| Break valve open | 0 | 0 | 0 | Scram signal | 250 | 248 | 250 | Safety injection signal | 340 | 340 | 340 | Stop of primary coolant pumps | 500 | 499 | 501 | Onset of SG depressurization and AFW injection | 945 | 941 | 947 | Onset of 2nd SG depressurization | None | None | 4550 | Termination of AFW injection | 2750 | None | 6720 | Initiation of ACC system | 3260 | 1650 | 3280 | Termination of ACC system | 7090 | 3420 | 5680 | Onset of noncondensable gas inflow to primary system | 7190 | 3750 | 5990 | SG secondary-side collapsed liquid level drop to 2 m | 8070 | None | None | Initiation of automatic core power reduction at maximum cladding surface temperature above 908 K | 9180 | None | 9150 | Actuation of LPI system | 9280 | 10370 | 9490 | Core power off | 9880 | 11600 | 10065 | Break valve closure | 9935 | 11609 | 10069 |
|
|