Research Article
Power Quality Investigation of Distribution Networks Embedded Wind Turbines
Figure 12
DGs performance after being subjected to SLG fault on a system containing recloser.
(a) Terminal voltage of the DGs (phase A) |
(b) Voltage of bus 15 (phase A) |
(c) Voltage of bus 15 (phases B and C) |
(d) DC-link voltage of DFIG and PMSG |