Municipal Solid Waste to Energy Generation in Bangladesh: Possible Scenarios to Generate Renewable Electricity in Dhaka and Chittagong City
Table 8
Scenario description for the WtE option in Dhaka and Chittagong, Bangladesh.
| Scenario | Description |
| Scenario A0 | Business as usual (BaU) scenario representing no WtE implementation. | Scenario A1 | All the MSW will be incinerated to generate electricity under the WtE project. | Scenario A2 | All the MSW will be landfilled to generate electricity from LFG, under the WtE project. | Scenario A3 | 50% MSW will be incinerated and 50% MSW will be utilized through LFG recovery system for integration of WtE (landfill and incineration) strategy. | Scenario A4 | 70% MSW will be incinerated and 30% MSW will be utilized through LFG recovery system for integration of WtE (landfill and incineration) strategy. | Scenario A5 | 30% MSW will be incinerated and 70% MSW will be utilized through LFG recovery system for integration of WtE (landfill and incineration) strategy. |
|
|