Research Article
Impacts of the Load Models on Optimal Planning of Distributed Generation in Distribution System
Figure 5
The convergence of multiobjective function (FMO) with iterations of 30-bus mesh system for (a) constant load, (b) industrial load, (c) residential load, and (d) commercial load.
(a) |
(b) |
(c) |
(d) |