Research Article

A Hybrid Short-Term Power Load Forecasting Model Based on the Singular Spectrum Analysis and Autoregressive Model

Figure 8

The forecasting error comparison of four methods: (a) absolute error rate; (b) HME and HPE.
424781.fig.008a
(a)
424781.fig.008b
(b)