Abstract

The purpose of this paper is to evaluate the optimal number of investigation points and each field test and laboratory test for a proper description of a building site. These optimal numbers are defined based on their minimum and maximum number and with the equivalent investigation ratio. The total increments of minimum and maximum number of investigation points for different building site conditions were determined. To facilitate the decision-making process for a number of investigation points, an Adaptive Network Fuzzy Inference System (ANFIS) was proposed. The obtained fuzzy inference system considers the influence of several entry parameters and computes the equivalent investigation ratio. The developed model (ANFIS-SI) can be applied to characterize any building site. The ANFIS-SI model takes into account project factors which are evaluated with a rating from 1 to 10. The model ANFIS-SI, with integrated recommendations can be used as a systematic decision support tool for engineers to evaluate the number of investigation points, field tests, and laboratory tests for a proper description of a building site. The determination of the optimal number of investigative points and the optimal number of each field test and laboratory test is presented on reference case.

1. Introduction

Planning geotechnical investigations is an important part of geotechnical design. The extent of the investigation should be based on the relationship between the surface conditions, subsurface conditions, and the project type. Insufficient geotechnical investigations can lead to inappropriate designs, delays in construction schedules, environmental damage to the site, costly construction modifications, and other problems.

There are many differences in opinion, among geotechnical experts from various countries, about the minimum quantity of tests that are required before a project can begin, that is, which and how many field and laboratory tests to carry out. In general, we know that if the quantity of investigations is too low, the risks become higher. Therefore, doing more investigations reduces the risks. However, when the risk is adequately low, more investigations will not significantly reduce the risks. For the remainder of this paper, this limit will be referred to as the optimum value of geotechnical investigation.

Determining the amount of preliminary site testing for a project depends on many factors, such as the type of structure, project area, structure geometry, the loading and sensitivity of the structure, site geology, the complexity of the geological structure, and similarities between the preliminary and general layout of the surrounding environment. The purpose of this paper is to evaluate the optimum value of geotechnical investigation needed before starting a project, as they depend on the above-mentioned factors. The optimum value of geotechnical investigation means the optimum number of investigation points, field tests, and laboratory tests that will give an adequate description of a building site.

The Eurocode 7-2 is a testing code that is used to adequately describe essential ground properties and make reliable assessments of ground parameters [1]. This code provides guidelines for carrying out preliminary geotechnical site testing and suggests the spacing scheme of individual ground samples and the minimum number of field tests and laboratory tests required before an engineering project can begin. Guidelines on the minimum number of individual ground samples are also available from other sources [24]. For example, Clayton et al. [5] have shown the impact that geologic, seismologic, and soil conditions can have on the design, safety, cost effectiveness, and execution of a proposed engineering project.

Research for this paper was carried out with the objective of unifying the criteria for geotechnical investigations and to develop a model for determining the optimum number of tests required before starting a project. The Adaptive-Network-Based Fuzzy Inference System (ANFIS) model was developed for this purpose. The basic structure of the fuzzy inference system (FIS) was introduced by Zadeh [6]. ANFIS, introduced by Jang [7], uses a given input/output data to construct a FIS, whose membership function parameters are adjusted using a backpropagation algorithm either alone or in combination with the Least Squares Method. This adjustment allows fuzzy systems to learn from the data they are modeling. ANFIS only supports Sugeno [8] identification models, which should only have one output parameter. The Adaptive Network is a superset of all kinds of feed-forward neural networks with supervised learning capability [9]. ANFIS is a fuzzy inference system implemented within the framework of adaptive networks and uses the advantages of neural networks and fuzzy logic.

Using the Nonstructural Fuzzy Decision Support System (NSFDSS) for site layout planning was proposed by Tam et al. [10]. This model integrates both experts’ judgment and computer-based decision modeling, thus making it suitable for the appraisal of complicated construction problems. The model provides a systematic procedure for helping project managers or planning engineers in determining site facility allocations. Huang et al. [11] developed a servo-control algorithm that uses fuzzy logic for automated soil testing. This paper introduces the concept of fuzzy control and its application in soil testing. Basheer et al. [12] showed that neural networks can be used to map and logically predict the variation of soil permeability in order to identify landfill boundaries and construct waste landfills. Rizzo et al. [13] presented a new site characterization method called SCANN (Site Characterization using Artificial Neural Networks) that is based on the use of neural networks to map the discrete spatially distributed fields.

These examples demonstrate that the ANFIS model has a superior method for solving problems in which there are many complex parameters that have an impact on both the process and results. This is valid when the process and results are not fully described and where experimental data are available.

The prediction of the quantity of field and laboratory tests is also of this type. The use of the ANFIS-SI model is presented on the numerical example. It is presented in such a form that anyone can repeat it and use it for planning geotechnical investigations.

2. Concept for Planning Geotechnical Investigation

The preliminary investigations and project conditions are necessary to get the information about the project structure, type of foundation, depth of foundation, groundwater level, and ground layering. Based on these conditions and on personal experience with past projects, an engineer must decide how many geotechnical investigations will be sufficient for a given project.

2.1. Quantity of Investigation

The Eurocode 7 [1] gives recommendations for how many samples should be tested for each stratum and how many field tests and laboratory tests should be carried out for each stratum. The number of samples and tests that should be done for each stratum, adapted from Bond and Harris [14], depends on the level of comparable experience: either extensive, medium, or none (see Figure 1). For the comparable experience level titled extensive, the minimum number () of each type of test is needed; for the comparable experience level titled none (or nonextensive), the maximum number () of each type of test is needed.

The optimal number of field and laboratory tests for each stratum () is defined by the equivalent investigation ratio (). The optimum number of investigations is found between the minimum number () of investigations and the maximum number () of investigations (see the following):An engineer’s judgment about the number of field and laboratory tests needed for a project is based on several impact parameters. When these parameters are favorable, the engineer has a relatively easy decision to make about the quantity of field and laboratory test (). When the parameters are unfavorable, more field and laboratory tests should be done. And for extremely unfavorable conditions, the maximum number of field and laboratory tests are required ():The total value of the optimal number () for each field and each laboratory test () is defined as the sum of the optimal number for every stratum ():The minimum number of each field and laboratory test required for the comparable experience level extensive () can be expressed as the lower number of each test () and the upper number of each test (), as a function of the project area (), the lower value of the project area (), and the upper value of the project area () (see (5), Figure 2): The maximum number of each field and laboratory test is expressed for the noncomparable experience (see (6), Figure 2):According to the Eurocode 7’s recommendations, adapted from Bond and Harris [14] and (5)-(6), the lower number of each test () and the upper number of tests required () for the comparable experience level extensive and nonextensive () should be done for each test.

Sampling tests should be performed on all boreholes. Sometimes it is also necessary to perform field tests on them. In view of this, it is necessary to first determine the number of investigation points that are required. For a proper description of the essential ground properties and a reliable assessment of ground parameters, an optimum number of investigation points () need to be defined. This number can also be defined by the equivalent investigation ratio () between the minimum and maximum number of investigation points:

2.2. Project Factors

The quantity of investigations also depends on many other project factors. These factors are referred to as the ANFIS system input factors. Each input factor () has a value between and The equivalent investigation ratio () is expressed as a function of the project factors ().

From (2) and (6), written in general form it followsValue can be written in formWhen all factors have a minimum value () then and maximum value () thenIt follows

2.3. ANFIS Input Factors

Determining the correct number of investigations to perform depends on many factors. These factors include type of structure, project area, stratification, layout geometry, loading/sensitivity of structure, site geology, complexity of geological structure, variability of soil layers, and the similarity between preliminary and existing surrounding environment.

For this paper, a system of ANFIS input factors is presented; an evaluation of these factors is shown in [15]. Using this system, the equivalent investigation ratio () is expressed as a function of input factors (see (13)). However, the main difference from paper [15] is that this paper provides additionally the optimal number of laboratory and field tests and not only the number of investigation points.

2.4. Decision Criteria

The decision criteria (see, e.g., Table 3) should be as clear and detailed as possible so that anyone can set values from 1 to 10 for each parameter of the building site. It is also necessary to involve as many experts as possible. This will help in adapting the impact of the individual parameters to the number of investigation points.

3. ANFIS Model for Building Site Investigations

The ANFIS model was developed to predict the optimal number of field and laboratory tests required for a project. The ANFIS model has inputs and one output . An additional model, the ANFIS-SI, was developed in order to predict the optimal number of tests. The MATLAB [16] was used as an interface between mathematical modeling and data inputs/outputs. This is a system that uses a high-level technical computing language.

3.1. Data Set

One of the most important stages in the ANFIS technique is collecting the data. First, the space is determined (Figure 3). The space is composed of four parameters using intervals from 1 to 10. Values with the factors of were determined for all the vertices. A system for determining the values of the vertices is presented in Table 1.

The training dataset of building sites can also be improved. Parameter values and the optimum number of investigation points can be assigned to this dataset. In this model, evaluations are defined for various site conditions. In the most favorable situation, the values of all parameters are equal to 1 and the minimal number of equivalent investigation ratio values is proposed as . Other vertices are obtained by considering the maximal ratios () for each parameter.

3.2. ANFIS Structure

For the Sugeno fuzzy model, a rule set with fuzzy “If-then” is as follows:

Rule :

Rule :

Rule :where are consequent parameters and , , , and are input variables. The output of each rule is equal to constant and the final output is the weighted average of each rule’s output: Weights are obtained from Gaussian membership function:where is responsible for its center and is responsible for its width. Parameters and are premise parameters. First membership grade of a fuzzy set () is calculated with the following equations:where , , , and are the input to Gaussian membership functions. Next the product of membership function for every rule is calculated:where represents the fire strength of the rule . Ratio of the th rule’s firing strength to the sum of all rule’s firing strengths is defined withThe input data represents a node on the left and right node represents the output data (Figure 3). The premise and consequent () parameters of ANFIS-SI model are calculated. By setting the premise and consequent parameters the space of variables is described.

4. Numerical Example: Project Type “Building”

A simple example, provided by Bond and Harris [14], considers a site where a new hotel complex is proposed, comprised of a five-story hotel building and associated car parking plus amenity areas. The building area is 80 m × 60 m. The general geology of the area indicates drift deposits comprised of glacial till or sand and gravel overlying Westphalian coal measures. The drift deposits may be up to 15 m deep and vary laterally. The authors mentioned that the number of investigation points should be in the range of ( = 9/30) and they proposed 12 as the optimal number of investigation points.

Eurocode 7-2 [1] gives the same recommendations for buildings with grid arrangements. It also recommends 15 to 40 m spacing in general and 60 m spacing for large areas. Bond and Harris [14] use the function “ceiling” and “floor” to determine the number of investigation pointswhere is the project area of the building, m2. , is the length and width of the building, m. , are the minimum and maximum number of investigation points. , are the minimum and maximum spacing between investigation points, m. Ceiling rounds up to the nearest integer. Floor rounds down to the nearest integer.

Using (23) and (24) gives us the number of investigation points in the form of a step function. For example, the minimum number of investigation points for a building area with a ratio of = 80/80 m is = 4 and = 9 for the area with a ratio of = 81/81 m. The maximum distance between the investigation points for high-rise and industrial objects is 40 m. But for large areas, the Eurocode 7-2 [1] allows a maximum distance of 60 m.

According to (7), (23), and (24), the suggested minimum () and maximum number of investigation points () are based on the project area (): the lower value () of the project area with the upper value of the project area () (see (25)-(26), Figure 4):

4.1. ANFIS Input Factors

For this numerical example, a system of four input factors is presented: layout geometry LG = , project condition PC = , geology GEO = , and similarity SIM = . An evaluation of these factors (see Table 2) is shown in [16].

Using this system, the equivalent investigation ratio () is expressed as a function of four project factors:

4.2. Decision Criteria

The criteria (Table 3) which were presented in [15] were developed based on past experience and engineering judgment. The table includes values from 1 to 10 for each parameter of the building site.

Input values for the ANFIS-SI model (see Table 4) were determined based on the criteria shown in Table 3.

Layout geometry (LG), project conditions (PC), geology (GEO), and similarity (SIM) are all considered input parameters, and the equivalent investigation ratio is considered an output parameter (see Table 5). In this model, 16 evaluations were defined for various building site conditions. In the most favorable situation, the values of all parameters are equal to 1 and the minimal number of equivalent investigation ratio values is proposed as = 0. Other vertices are obtained by considering the ratios () for each parameter.

The calculation procedure of is shown in Table 6.

The fire strength for every rule was calculated. Then the output of each rule was determined using the fire strength combined with the consequent parameters. The final output is the weighted average of each rule’s output. The values for numerical examples are given in Table 7.

The value of = 0.472 was obtained from the ANFIS-SI model and the assigned values (Table 7). Using this value, the optimum number of investigation points was calculated:Determining the optimum number of each test is similar to determining the number of investigation points (see Table 9). For example, the optimum number of the PSD test (, per stratum) is The result is the same value suggested in the reference case (Bond and Harris). The minimum depth of investigation points (boreholes) for a five-story concrete building according to Sowers [17] should be The applicability of sampling methods, groundwater measurement systems, field tests, and laboratory tests are very important for obtaining the parameters. The specification of field and laboratory tests is presented in Table 8. The calculation considers the minimum number of tests by using the recommendations in the Eurocode 7-2 [1].

The number of single tests was calculated using (2) (see Table 9).

5. Conclusion

This paper deals with determining the optimal quantity of geotechnical investigations required for a construction project. The optimal number of investigative points and the optimal number of each field and laboratory test are defined based on their minimum and maximum number as well as the equivalent investigation ratio. The equivalent investigation ratio describes the optimum number of investigations and is a number between the minimum and maximum values.

The total number of increments between the minimum and maximum amount of investigation points for different building site conditions was determined. To facilitate the decision-making process for a number of investigation points, an Adaptive Network Fuzzy Inference System (ANFIS) was proposed. This system was designed to determine the influence of several entry parameters and to compute the equivalent investigation ratio.

The newly developed ANFIS-SI model is used to characterize any building site. The ANFIS-SI model takes into account project factors such as type of structure, project area, layout geometry, loading, site geology, complexity of geological structure, and the similarity between the preliminary and existing surrounding environment. Each structure requires its own model, depending on its specific characteristics. Project factors are evaluated with a rating from 1 to 10. The impact of each factor and its correlation to the equivalent investigation ratio is then determined. The ANFIS-SI model, which has integrated recommendations, can be used as a systematic decision support tool for engineers. It is useful in evaluating the number of investigation points, field tests, and laboratory tests required for a building site. The result is written in the general form for each type of structure.

Determining the optimal number of investigative points, field tests, and laboratory tests is presented in the form of a case study. The ANFIS-SI model is easy to use; however its biggest problem is in determining the evaluation ratings of project factors. Site ratings should only be done by experts with experience in the field of construction. The aim of further research should be to improve the decision criteria. This could be done only with cooperation by the experts who have a prolonged or intense experience through practice and education in site investigations.

Competing Interests

The authors declare that they have no competing interests.