Research Article
Battery Energy Storage System for PV Output Power Leveling
Figure 15
Operation of the phase shift controller during changing power from 1 kW to 2 kW at V and V for a duration of 1.7 s. (a) Low-side transformer voltage. (b) High-side transformer voltage side voltage. (c) Low-voltage-side current. (d) High-voltage-side current.
(a) |
(b) |
(c) |
(d) |