Research Article

Siting and Sizing of DG in Medium Primary Radial Distribution System with Enhanced Voltage Stability

Table 2

Estimation of power loss if the substation and DG are scheduled for different values.

CaseDGcapacity, MWTotal load (MW)S.S.supply, MWPower Loss, MWPower loss reduction (%)Voltage profile
As per TVDScheduledAs per TVDScheduledMinMax

Case  12525 5025252.08600.97 @ 31.000 @ 6
30202.22550.94 @ 31.000 @ 6
20302.19520.94 @ 31.002 @ 6

Case  22828 5022223.52680.96 @ 31.001 @ 6
35153.8580.94 @ 21.005 @ 6
15353.75570.93 @ 31.008 @ 5

Case  32222 5028282.072610.95 @ 31.000 @ 6
32182.12560.93 @ 31.051 @ 5
18322.23560.93 @ 31.038 @ 5