Multiobjective Stochastic Power System Expansion Planning Considering Wind Farms and Demand Response
Table 1
Candidate generation units and transmission lines.
| Technology | Generation units | Capacity (MW) | Candidate lines | 1 | 2 | 3 | 1 | 2 | Capacity (MW) | Cost (/MW) | Capacity (MW) | Cost (/MW) | Capacity (MW) | Cost (/MW) | Susceptance (pu) | Cost (/MW) | Susceptance | Cost (/MW) |
| WFs | 15 | 19.5 | 20 | 26 | 50 | 65 | 50 | 0.128 | 144.39 | 0.192 | 129.95 | Hydro | 50 | 62.5 | 60 | 70 | 70 | 82.6 | 80 | 0.192 | 151.17 | 0.224 | 136.05 | Steam | 75 | 75 | 100 | 95 | 125 | 112.5 | 100 | 0.224 | 155.69 | 0.336 | 140.12 | Gas | 30 | 27 | 40 | 34 | 50 | 40 | 150 | 0.392 | 163.49 | 0.420 | 147.14 | Combined | 135 | 148.5 | 160 | 168 | 180 | 180 | 180 | 0.420 | 220.26 | 0.490 | 198.23 |
|
|