Evaluation of Safety Performance in a Construction Organization in India: A Study

Table 3

Control limits from week 1 to 8.

WeekUpper control limitLower control limit

10.2020.158
20.1790.137
30.1560.116
40.1000.068
50.1000.068
60.0630.037
70.0630.037
80.0450.025