Research Article
A Comprehensive Study of Micro-Hydropower Plant and Its Potential in Bangladesh
Table 4
Potential sites identified by IFRD of BCSIR.
| Name of water falls | Average discharge (Litre/sec) | Approximate duration of flow (months) | Probable fall for hydropower generation (meter) | Electrical power (KW) | Annual energy production (kWh) |
| Sailopropat, Banderban | 100 | 12 | 6 | 5 | 43,800 | Madhobkundu, Moulvibazar | 150 | 12 | 10 | 15 | 131,400 |
|
|