Research Article
Health Monitoring of Nuclear Structure Containment Using Strain Gauges to Assess the Integrity
Table 1
Chronological events of proof test and ILRT.
| Sl. no. | Activity |
| 1 | Zero run-up test started after RB box up for PC ILRT | 2 | Pressurization started | 3 | Pressure reached at 0.35 kg/cm2 (g) | 4 | Pressurization started after temp stabilisation and rundown at 0.35 kg/cm2 (g) | 5 | Pressure reached at 0.7 kg/cm2 (g) | 6 | Pressurization started after temp stabilisation and rundown at 0.7 kg/cm2 (g) | 7 | Pressure reached at 1.06 kg/cm2 (g) | 8 | Pressurization started after temp stabilisation and rundown at 1.06 kg/cm2 (g) | 9 | Pressure reached at 1.4 kg/cm2 (g) | 10 | Pressurization started after pressure stabilisation and strain/deflection data collection | 11 | Pressure reached—1.73 kg/cm2 (g) | 12 | Depressurization started after pressure stabilisation and strain/deflection data collection | 13 | Pressure reached—1.4 kg/cm2 (g) | 14 | Depressurization started after pressure stabilisation and strain/deflection data collection | 15 | Pressure reached—1.06 kg/cm2 (g) | 16 | Depressurization started after temp stabilisation, rundown and superimposition test at 1.06 kg/cm2 (g) | 17 | Pressure reached—0.7 kg/cm2 (g) | 18 | Depressurization started after temp stabilisation and rundown at 0.7 kg/cm2 (g) | 19 | Pressure reached—0.35 kg/cm2 (g) |
|
|