Solution to Security Constrained Environmental Pumped-Storage Hydraulic Unit Scheduling Problem by Genetic Algorithm

Table 6

Per unit load schedule for the example power system.

Bus no.Load typeTime subinterval number, ( )
123456

2Active0.200.801.000.800.400.20
Reactive0.150.600.750.600.300.15
3Active0.501.101.201.100.600.50
Reactive0.400.850.900.850.450.40
5Active0.300.900.800.900.250.30
Reactive0.240.700.600.700.200.24
7Active0.251.001.101.000.500.25
Reactive0.200.750.850.750.400.20
8Active0.400.700.900.700.300.40
Reactive0.300.520.700.520.240.30
10Active0.150.601.050.600.450.15
Reactive0.120.450.800.450.350.12
12Active0.200.900.950.900.500.20
Reactive0.150.700.750.700.400.15

  (pu)2.006.007.006.003.002.00
  (pu)1.564.575.354.572.341.56