Research Article

A Heuristic Approach to Flow Shop Scheduling Problem in Which Processing Times Are Associated with Their Respective Probabilities with No-Idle Constraint

Table 6

In-out table.

Jobs

10–415–2029–3131–43
24–620–2431–3543–51
36–924–3335–4151–54
49–1833–4141–4954–56
518–2441–4949-5056–58