Research Article
Boosting Transmission System Flexibility in Network-Constrained Unit Commitment by Incorporating Distributed Series Reactors
Table 8
Comparison costs in different case studies.
| Case study # | Model | Total cost ($) | Total incentive for DRP ($) | Reduced costs compared to UC (%) |
| 1 | UC | 507859.42 | ā | ā | 2 | UC-DR | 487808.90 | 11275.33 | 3.94 | 3 | UC-DR-DER | 431201.51 | 10167.91 | 15.09 | 4 | UC-DR-DER-DSR | 427877.17 | 9991.96 | 15.74 |
|
|