Research Article

Boosting Transmission System Flexibility in Network-Constrained Unit Commitment by Incorporating Distributed Series Reactors

Table 8

Comparison costs in different case studies.

Case study #ModelTotal cost ($)Total incentive for DRP ($)Reduced costs compared to UC (%)

1UC507859.42ā€”ā€”
2UC-DR487808.9011275.333.94
3UC-DR-DER431201.5110167.9115.09
4UC-DR-DER-DSR427877.179991.9615.74