Research Article
Multi-Time Scale Rolling Optimization Scheduling of “Nealy-Zero Carbon Park” Based on Stepped Carbon Allowance Trading
Table 2
Optimization results in each scenario and carbon emissions after allowance offset.
| Type | Scenario 1 | Scenario 2 | Scenario 3 |
| Energy purchase cost | 6.77 | 7.32 | 6.63 | Operation and maintenance costs of renewable energy power generation equipment | 1.51 | 1.78 | 1.35 | Waste utilization system operating costs | 3.23 | 3.23 | 3.23 | CCGPP operating cost | 4.72 | 5.13 | 5.41 | P2G unit operating cost | 0.72 | 0.93 | 0.95 | Carbon sequestration cost | 0.11 | 0.25 | 0.33 | Carbon allowance transaction cost | 0 | -0.51 | -4.51 | CO2 emissions after allowance offset | 752.14 | 40.58 | 8.99 | Total operating cost | 17.06 | 18.15 | 13.39 |
|
|
Unit: 104¥.
|