Study of the Causes and Magnitude of Wastage of Materials on Construction Sites in Jordan
Table 2
Ranking of causes of wastage.
| Cause of wastage
| F.I | S.I | I.I | Rank |
| Frequent design and client’s changes | 74.21 | 74.84 | 55.54 | 1 | Rework due to workers mistakes | 73.56 | 74.33 | 54.68 | 2 | Poor contract documents | 72.63 | 72.15 | 52.40 | 3 | Wrong and lack of storage of materials | 71.84 | 70.65 | 50.75 | 4 | Poor strategy for waste minimization | 70.01 | 70.23 | 49.17 | 5 | Shortage and lack of experience of skilled workers | 69.66 | 69.69 | 48.55 | 6 | Poor site conditions | 70.01 | 68.52 | 47.97 | 7 | Damage during transportation | 69.92 | 67.53 | 47.22 | 8 | Theft and vandalism | 68.50 | 68.35 | 46.82 | 9 | Mistakes in quantity surveying and overallowance | 68.11 | 67.25 | 45.80 | 10 | Poor quality and nonavailability of equipment | 67.79 | 66.34 | 44.97 | 11 | Weather conditions | 68.02 | 65.89 | 44.82 | 12 | Waste resulting from poor packaging | 67.59 | 65.31 | 44.14 | 13 | Leftover material on site | 66.15 | 66.02 | 43.67 | 14 | Wrong handling of materials | 65.13 | 65.42 | 42.61 | 15 | Poor quality of materials | 64.25 | 65.12 | 41.84 | 16 | Ordering errors | 63.70 | 65.32 | 41.61 | 17 | Purchasing materials not complying with specifications | 63.01 | 64.26 | 40.49 | 18 | Supply in loose form | 61.98 | 65.06 | 40.32 | 19 | Complicated design | 61.88 | 64.39 | 39.84 | 20 | Damage caused by workers due to lack of experience | 60.25 | 64.23 | 38.70 | 21 | Long project duration | 58.96 | 63.48 | 37.43 | 22 | Unnecessary material handling | 58.46 | 62.34 | 36.44 | 23 | Change in material prices | 57.44 | 62.18 | 35.72 | 24 | Interaction between various specialists | 56.31 | 55.98 | 31.52 | 25 |
|
|