LEED-NC credits that can be earned by each family and assembly groups using BIM-based performance analysis software | Roof | Floor | Windows | Doors | Wall |
LEED Credit | Credit Description | LEED Points | PEP | EPM | PEP | EPM | PEP | EPM | PEP | EPM | PEP | EPM |
|
Sustainable sites | | | | | | | | | | | | |
SSp1 | Construction activity pollution prevention | Required | | | | | | | | | | |
SSc1 | Site selection | 1 | | | | | | | | | | |
SSc2 | Development density and community connectivity |
3, 5 | | | | | | | | | | |
SSc3 | Brownfield redevelopment | 1 | | | | | | | | | | |
SSc4.1 | Public transportation access | 3, 6 | | | | | | | | | | |
SSc4.2 | Bicycle storage and changing rooms | 1 | | | | | | | | | | |
SSc4.3 | Low-emitting and fuel-efficient vehicles | 3 | | | | | | | | | | |
SSc4.4 | Parking capacity | 2 | | | | | | | | | | |
SSc5.1 | Protect and restore habitat | 1 | | | | | | | | | | |
SSc5.2 | Maximize open space | 1 | | | | | | | | | | |
SSc6.1 | Storm water design: quantity control | 1 | | | | | | | | | | |
SSc6.2 | Storm water design: quality control | 1 | | | | | | | | | | |
SSc7.1 | Heat island effect: nonroof | 1 | | | | | | | | | | |
SSc7.2 | Heat island effect: roof | 1 | | | | | | | | | | |
SSc8 | Light pollution reduction | 1 | | | | | | | | | | |
Water efficiency | | | | | | | | | | | | |
WEp1 | Water use reduction | Required | | | | | | | | | | |
WEc1 | Water efficient landscaping | 2, 4 | | | | | | | | | | |
WEc2 | Innovative wastewater technologies | 2 | | | | | | | | | | |
WEc3 | Water use reduction | 2–4 | | | | | | | | | | |
Energy and atmosphere | | | | | | | | | | | | |
EAp1 | Fundamental commissioning of building energy systems | Required | | | | | | | | | | |
EAp2 | Minimum energy performance | Required | | | | | | | * | | | |
EAp3 | Fundamental refrigerant management | Required | | | | | | | | | | |
EAc1 | Optimize energy performance | 1–19 | * | 6 points | | | * | 8 pts | * | 6 points | * | 8 pts |
EAc2 | On-site renewable energy | 1–7 | | | | | | | | | | |
EAc3 | Enhanced commissioning | 2 | | | | | | | | | | |
EAc4 | Enhanced refrigerant management | 2 | | | | | | | | | | |
EAc5 | Measurement and verification | 3 | | | | | | | | | | |
EAc6 | Green power | 2 | | | | | | | | | | |
Materials and resources | | | | | | | | | | | | |
MRp1 | Storage and collection of recyclables | Required | | | | | | | | | | |
MRc1.1 | Building reuse: maintain existing walls, floors, and roof | 1–3 | | | | | | | | | | |
MRc1.2 | Building reuse: maintain interior nonstructural elements | 1 | | | | | | | | | | |
MRc2 | Construction waste management | 1-2 | | | | | | | | | | |
MRc3 | Materials reuse | 1-2 | * | 1 point | * | 1 point | * | 1 pt | * | 1 point | | |
MRc4 | Recycled content | 1-2 | * | 1 point | | | * | 1 pt | | | | |
MRc5 | Regional materials | 1-2 | * | 1 point | * | 1 point | * | 1 pt | * | 1 point | | |
MRc6 | Rapidly renewable materials | 1 | | | | | | | | | | |
MRc7 | Certified wood | 1 | | | | | | | | | | |
Indoor environmental quality | | | | | | | | | | | | |
EQp1 | Minimum indoor air quality (IAQ) performance | Required | | | | | | | | | | |
EQp2 | Environmental tobacco smoke (ETS) control | Required | | | | | | | | | | |
EQc1 | Outdoor air delivery monitoring | 1 | | | | | | | | | | |
EQc2 | Increased ventilation | 1 | | | | | | | | | | |
EQc3.1 | Construction IAQ management plan: during construction | 1 | | | | | | | | | | |
EQc3.2 | Construction IAQ management plan: before occupancy | 1 | | | | | | | | | | |
EQc4.1 | Low-emitting materials: adhesives and sealants | 1 | | | | | * | 1 point | | | | |
EQc4.2 | Low-emitting materials: paints and coatings | 1 | | | | | | | | | | |
EQc4.3 | Low-emitting materials: flooring systems | 1 | | | * | 1 point | | | | | | |
EQc4.4 | Low-emitting materials: composite wood and agrifiber products | 1 | | | | | | | | | | |
EQc5 | Indoor chemical and pollutant source control | 1 | | | | | | | | | | |
EQc6.1 | Controllability of system: lighting | 1 | | | | | | | | | | |
EQc6.2 | Controllability of system: thermal comfort | 1 | | | | | | | | | | |
EQc7.1 | Thermal comfort: design | 1 | | | | | | | | | | |
EQc7.2 | Thermal comfort: verification | 1 | | | | | | | | | | |
EQc8.1 | Daylight and views: daylight | 1 | * | 1 point | | | * | 1 point | * | 1 point | * | 1 point |
EQc8.2 | Daylight and views: views | 1 | | | | | | | | | | |
Innovation and design process | | | | | | | | | | | | |
IDc1 | Innovation in design | 1–5 | | | | | | | | | | |
IDc2 | Accredited professional | 1 | | | | | | | | | | |
Regional priority | | | | | | | | | | | | |
RPc1 | Durable building | 1 | | | | | | | | | | |
RPc2 | Regional priority credit | 1–3 | | | | | | | | | | |
|
| | Subtotal | 10 points | 3 points | 13 points | 9 points | 9 points |
|
| | Total | 44 points |
|